NEWS FROM HOVING HOLLAND INT.BV
-08-07-11 Monaghan Carbury sets in operation a truck loading system.
-26-04-11 WTT orders tunneling equipment for Spanish customer
-26-04-11 Hoving Holland INT.BV designs and delivers a tunnelwinch to Monaghan Tunneltech North
-19-04-11 WPZ Poland orders phase I composting equipment
-19-04-11 Komptech Veolia London orders equipment to fill tunnels
-04-04-11 Schmaus Germany ready for production of phase I compost
-18-02-11 Tunneling equipment into production at Geraedts Japan
-03-02-11 Biofungi ordered 2 block press machines to be installed in the existing line
-03-02-11 Hoving Holland INT.BV is designing a straw blending line for a new customer, Funghitex Italy
-03-02-11 Reducer elevator SWG Böging taken into production
-04-11-10 Hoving Holland designs a straw blending line for Wiesenhof
-19-10-10 Monterey San Miguel orders similar head filling machine
-19-10-10 Monterey Madisonville orders Phase I composting equipment
-19-10-10 OWS Twence orders conveyors for fermentation installation
-15-10-10 Hoving Holland designing equipment for Ontario Mushroom Farms
-01-10-10 Mixing line installed at SWG Boging
-30-07-10 Small head filling machine into production
-19-07-10 Metaalunie conditions on website Hoving Holland
-06-05-10 Hoving Holland INT.BV is manufacturing a blending line for Ontario Mushroom Farms
-06-05-10 Schmaus Champignons orders a mixing line at Hoving Holland INT.BV
-13-11-09 Orgaworld orders the 3th screening line for the devision Drachten
-14-08-09 Hoving Holland INT.BV designs filling equipment for Primera Harvest
-13-08-09 Hoving Holland is manufacturing a blending line for Monaghan Carbury
-13-08-09 WPZ Poland orders a block press line as delivered before
-18-06-09 Bunkerfiller delivered at SWG Böging
-28-04-09 CNC Milsbeek is replacing a tunnelwinch
-28-04-09 Replacement of two top filling systems at Walkro Blitterswijck
-28-04-09 Orgaworld orders another screening line
-04-03-09 Conveyor installed at Van der Velde
-20-02-09 Phase 1&2 compost ready to be used at the site of CNC Milsbeek
-20-02-09 Tunneltech North ordered a Straw blending line
-20-02-09 Head filling machine to be delivered to Carleton Mushrooms
-13-02-09 Biofunghi also bought a storage hopper we had in store
-13-02-09 Reducer elevator delivered at Biofunghi
-06-01-09 Dutch version of a Siemens article
-28-08-08 Tunnel filling and emptying equipment for Monaghan Carbury
-05-05-08 Hoving Holland designs a head filling machine for Premier Mushrooms
-26-09-08 Extension of screening line Orgaworld Canada
-21-03-08 Cassette delivered at Sousacamp Portugal
-09-02-08 Bunkerfiller delivered at Premier Muschrooms USA
-31-10-07 Blockpress machine delivered at WPZ Poland
-17-09-07 Head filling machine and winch delivered at Monaghan Whitley United Kingdom
-30-08-07 Mixing and filling equipment for Holpol Poland
-05-07-07 Straw mixing line for Biofungi Hungary
-08-06-07 Delivery of a bunkerfiller at Monterey Mushrooms Mexico
-10-05-07 Head filling machine, winch and shelf emptying conveyor for Monaghan Langford United Kingdom
-13-04-07 Screening installation for Orgaworld Canada
-29-01-07 Blockpress line and seal unit for Snow White Mushrooms Australia
-10-01-07 Tunnel / shelf filling equipment for JMBH Holding Canada
-05-08-06 Bunkerfiller to Mikos PE Ukraine
-07-07-06 Installation for separation of iron parts for ARN Nijmegen Holland
-16-02-06 Truck loading conveyor for Biofungi Hungary
-15-06-06 Tunnel filling cassette V-model for Sterckx Belgium